![ABB IRB 14000 Скачать руководство пользователя страница 125](http://html.mh-extra.com/html/abb/irb-14000/irb-14000_product-manual_5024125.webp)
Note
Action
Tightening torque: 0.2 Nm.
xx1500000696
Refit the two remaining screws of the body cover.
5
Flange screw (2 pcs)
Refit the attacment screws.
6
Tightening torque: 0.2 Nm.
xx1500000525
Concluding procedure
Note
Action
See
Updating revolution counters on
Update the revolution counters.
1
CAUTION
Make sure all safety requirements are met
when performing the first test run. These
are further detailed in the section
- First test run may cause injury or damage!
on page 53
2
Product manual - IRB 14000
125
3HAC052983-001 Revision: D
© Copyright 2015 - 2016 ABB. All rights reserved.
3 Maintenance
3.4.1 Replacing the battery pack
Continued
Содержание IRB 14000
Страница 1: ...Product manual IRB 14000 ...
Страница 2: ...Trace back information Workspace R16 2 version a5 Checked in 2016 09 08 Skribenta version 4 6 318 ...
Страница 8: ...This page is intentionally left blank ...
Страница 16: ...This page is intentionally left blank ...
Страница 416: ...This page is intentionally left blank ...
Страница 436: ...This page is intentionally left blank ...
Страница 440: ...This page is intentionally left blank ...
Страница 456: ......
Страница 457: ......