5.
Placement and Connection
5.1. About placement and connection
When all mechanical work is finished, the HVC 450 kW E-Bus Charger can be placed and
connected.
The planning steps for the placement and connection phase are shown in the figure below.
Usually the procedure can be done within one day.
C1
on Page 52.
C2
on Page 53.
C3
Move Power Cabinet to position
on Page 54 and
Install Power Cabinet onto the
on Page 57.
C4
on Page 64,
on Page 70,
AC utility power, Interlock and CAN cables Power Cabinet
power, Interlock and CAN cables on Page 72 and
Connect the communication fiber
on Page 80.
C5
on Page 82.
C6
on Page 83,
Install vertical frame onto the foundation
Install horizontal frame onto the vertical frame
on Page 86.