HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
52
of
128
C7
Connect the GND wire to the ABB Pole
on Page 91.
C8
on Page 103 and
Grouting of the pole construction
5.2. Route the cables
on Page 46 for details which cables must be used.
2. Remove the top cover plate (B) and the front cover plate (C) from the foundation (A) by
loosen the bolts (D).
3. Put the front cover plate (C) and its bolts (D) in a safe location as it will be installed again
later on.
NOTICE
Step 2 and 3 are only applicable when the Power Cabinet is placed on a
concrete foundation.
The top cover plate is not needed any more after the cabinet is placed on
the foundation.
4. Route the DC power cables through the 6.30 Inch cable conduit.
5. Route the AC utility power, GND wire and Interlock cable through the other 6.30 Inch
cable conduit.
6. Route the communication glass fiber cable through the extra 1.58 Inch cable conduit.
CAUTION
To prevent damage to the glass fiber optic cable, a minimum of two
persons is required to route the glass fiber cable through the conduit. One
person for pulling, the other person to guide the glass fiber cable.
Ensure that the glass fiber cable is carefully rolled out before it is pulled
through the conduit, and do not use large traction forces, this can damage
the glass fiber cable.