![ABB HVC Скачать руководство пользователя страница 60](http://html.mh-extra.com/html/abb/hvc/hvc_installation-manual_1093060.webp)
HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
60
of
128
5.5.3. Move the sliding plate of the guidance plates of the cabinet
Preconditions:
Tools: spanner (size 13).
1. Loosen the bolts (A).
2. Move the sliding plate (B) of the 2 guidance plates.
5.5.4. Route cables through guidance plates
1. Route the cables (A) through the right guidance plates (B).
2. Make sure that there is sufficient cable length to reach the connectors at the top of the
cabinet.