![ABB HVC Скачать руководство пользователя страница 38](http://html.mh-extra.com/html/abb/hvc/hvc_installation-manual_1093038.webp)
HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
38
of
128
NOTICE
This extra cable length is required to connect the AC power cable with
the connectors in the Power Cabinet without problems.
11. Place both cover plates on the appropriate place on the foundation.
12. Secure the top cover plate with M16 bolts (4x) and the front cover plate with M12 bolts
(4x).
WARNING
These cover plates are required to prevent people from falling into the
foundation.