HVC 450 kW E-Bus Charger Installation Guide
Revision: 1.2
COMPANY CONFIDENTIAL
Date released: 16-08-2018
Page
101
of
128
5.16.9.
Connect the other cables to the ACS Control Module
Preconditions:
Tools: wire cutter, wire stripper pliers, screwdriver, ferrules, crimp pliers.
Overview of the terminal block
A
Pantograph heater cable
E
EMO cable
B
Interlock cable
F
Beacon cable
C
Pantograph CP/PE cable
G Distance sensor cable
D
ACS Control cable
1. Loosen and remove the cable gland
in Page 92) for the cables.
2.
Slide the cable gland’s nut over the cables.
3. Route the cables through the right glands to the connector blocks (X2, X3 and X4), with
sufficient cable length (do not make the cable routing too tight, or too loose).
4. Tighten the nuts of the glands to secure the cables.
5. Strip the insulation from the cables.
6. Cut the wires of the cables to the correct lengths to reach the connectors
7. Strip 0.43 Inch of the insulation from the ends of the wires.
8. Crimp a ferrule onto the end of the wire.
9. Loosen the connector screws.
10. Insert the GND wire from the Pantograph heater cable into the one of the free connectors
of GND-rail (PE2).
11. Tighten the connector screw of GND-rail (PE2).
12. Insert the other wires into the correct connectors, see table below:
X2
Pantograph heater cable
1
Wire 1
2
Wire 2
PE2
GND (green/yellow)
GND
X3
X4
Interlock cable
4
Shield
GND
1
Wire 1
Ext Interlock In
2
Wire 2
Ext Interlock Out
X3
X4
Pantograph CP/PE cable
4
Shield
GND
3
Wire 1
CP