Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
Terminal system
The bushing can be configured with one of two terminal systems: the draw-lead system, or the draw-rod
system.
The draw-rod system can be configured with a small, or a large bottom contact.
Terminal system
Option
Draw-lead system
-
Draw-rod system
Small bottom contact
Large bottom contact
G004304
A
Draw-lead system
B
Draw-rod system with small bottom contact, N1 = 4
C
Draw-rod system with large bottom contact, N1 = 4
2
Draw lead
32 Inner terminal
35 Draw rod
40 Small bottom contact, N1 = 4
41 Large bottom contact, N1 = 4