![ABB GOE(2) Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362032.webp)
32
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
4.5.4 Installation of the bushing on the transformer
Overview
It is important to install the draw rod correctly, thus the ends of the draw rod parts must make contact at (67).
G007287
CAUTION!
Do not disassemble the joints (52), these are correctly assembled and locked with tread-locking
fluid by ABB.
Procedure
1.
Connect the upper draw rod (35) to the lower
draw rod (4).
G001932
Содержание GOE(2)
Страница 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Страница 78: ......
Страница 79: ......