Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
Procedure
1.
Install the shaft (37) of the hydraulic jack on the
draw rod (35), and put the box-spanner (13) on
the shaft (37) .
G006805
2.
Make sure that more than 10 mm of the threads
on the upper draw rod (35) is used by the shaft
(37).
G006806
3.
Put the hydraulic jack (38) on the shaft (37), and
install the nut (44) and washer but do not
tighten it.
NOTE!
The hydraulic jack must be in the
middle of its stroke. If not, the tension
of the draw rod cannot be released
when the draw rod nut is loosened.
G006807