![ABB GOE(2) Скачать руководство пользователя страница 28](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362028.webp)
28
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
8.
Apply Molykote Multilub to the threads on the
pull-through cord (12), then connect it to the upper
draw rod.
NOTE!
The terminal on the pull-through cord
(12) has M8 threads.
NOTE!
Or use a lubricant with equal properties
to Molykote Multilub.
G004896
9.
Remove the draw rod nut (10).
NOTE!
The draw rod will fall out of the bushing
if it is not in the horizontal position.
G006812
10.
Pull down the draw rod from the bottom end of the
bushing, and disassemble it at the lower joint (39).
NOTE!
The upper thread (60) is locked with
thread-locking fluid grade 42.
NOTE!
As standard the thread joint (56)
between the draw rod and the bottom
contact is locked with thread-locking
fluid grade 42.
The guiding cone (62) is loose.
G006813
11.
Carefully look for damage at the bottom end of the bushing, and the inside of the center hole.
End of instruction
Содержание GOE(2)
Страница 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Страница 78: ......
Страница 79: ......