![ABB GOE(2) Скачать руководство пользователя страница 41](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362041.webp)
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
41
8.
Tighten the draw-rod nut (10).
G005062
Torque
10 Nm
9.
Remove the bolts (6), washers (7) and lifting
tool (1).
G001935
10.
Remove the pull-through cord (12).
11.
Tighten the draw-rod nut, refer to
Hydraulic tightening of the draw-rod nut,
page
Manual
tightening of the draw-rod nut,
page
End of instruction
Содержание GOE(2)
Страница 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Страница 78: ......
Страница 79: ......