![ABB GOE(2) Скачать руководство пользователя страница 65](http://html.mh-extra.com/html/abb/goe-2/goe-2_installation-and-commissioning-manual_5362065.webp)
Installation and commissioning guide
1ZSC000563-ACF EN, REV. A, 2020-06-25
65
7.
Disassemble the draw rod at the lower joint (39).
Use the key grip on the lower draw rod.
DANGER!
Make sure that the upper draw rod
does not fall down when the lower
joint (39) is disassembled.
CAUTION!
Do not disassemble the joint (60), this
increases the risk of incorrect
assembly.
The joint (60) is locked with
tread-locking fluid grade 42.
NOTE!
The bushing can have an optional joint,
or the bottom contact unlocked (56),
refer to the specifications for your
bushing.
The guiding cone (62) is loose.
G005033
8.
Pull up the draw rod, and install the washer (11)
and nut (10).
G001872
9.
Remove the pull-through cord (12).
10.
Lower the bushing to the floor.
CAUTION!
Make sure that there is soft bedding, or support blocks on the floor.
Содержание GOE(2)
Страница 76: ...76 Installation and commissioning guide 1ZSC000563 ACF EN REV A 2020 06 25 ...
Страница 78: ......
Страница 79: ......