ABB Distribution Protection Unit 1500R
11-6
Maintenance and Testing
9/99
website:www.abb.com/papd
•
Ic (L3) = 300.0
120°
(±6 A)
•
In = 0.0
(±6 A)
•
kVan (UL1) = 12.0
0°
(±0.12 kV)
•
kVbn (UL2) = 12.0
240°
(±0.12 kV)
•
kVcn (UL3) = 12.0
120°
(±0.12 kV)
•
kW-A (L1) = 3600
(±144 kW)
•
kW-B (L2) = 3600
(±144 kW)
•
kW-C (L3) = 3600
(±144 kW)
•
kW-3P = 10800
(±432 kW)
•
kVAR-A (L1) = 0
(±144 kW)
•
kVAR-B (L2) = 0
(±144 kW)
•
kVAR-C (L3) = 0
(±144 kW)
•
kVAR-3P = 0
(±432 kW)
•
I
0
= 0
(±6 A)
•
I
1
= 300
0°
(±6 A)
•
I
2
= 0
0°
(±6 A)
•
kV
1
= 12.00
0°
(±0.12 kV)
•
kV
2
= 0
0°
(±0.12 kV)
•
PF = 1.00
Lagging or Leading
•
Freq = 60.00
(± 0.01 Hz)
4.
Connect the DPU1500R as shown in Figure 11-4. Apply 3.0 A to C (L3)-Phase and the Neutral. Read the current
from the Metering Menu as above. The currents Ic and In should be 300.0 ±6 A.
Pickup—Time Overcurrent
Follow these steps to check the time overcurrent of the pickup current.
1.
Connect the DPU1500R as shown in Figure 11-3.
2.
Apply 5.5 A, gradually increasing the current until the PICKUP LED just lights. This should be within ±3% of the
pickup (see Table 11-1) or ±0.18 A (±18.0 A primary). This confirms the continuity and accuracy of phases A (L1)
and B (L2).
3.
Decrease the input current to 0 and reset targets, if necessary, by pressing the target reset push button.
4.
Connect the DPU1500R as shown in Figure 11-4. Repeat Step 2 to confirm the continuity and accuracy of
phase C (L3) and Neutral.
)
)
)
)
)
)
)
)