Controller Wiring
Refer to Appendix A for Controller Operation information. Refer to Appendix B for the pin assignment
for controller connectors.
Step
Action
1.
ESD Ground Connector is located on the lower
right corner of the distribution section for
connection of a wrist strap.
2.
J1
-
Plant Interface Connection: Factory Installed.
Violet Wire is
“
Open String (OS) signal from battery breakers.
The Yellow Wire is
-
48FAJ from load breakers.
3.
J2
-
Voltage/Temperature (VT) Probe Connection:
RJ
-
45 connection from Voltage/Thermal (VT) probes from
mid
-
string battery post of battery.
If using ES771 Voltage Module, Verify the 1
-
Wire serial bus reference:
The ES771 modules must be referenced to the most negative potential of the DC bus. This reference is achieved
by the proper setting of Jumper 11 next to the relay configuration jumpers. Following are the appropriate
settings for negative and positive power plants.
For +24V systems with Negative Grounded batteries
Pin 1
For
-
48V systems with Positive Grounded batteries
Pin 1
Содержание CPS6000-Systems-48V DC Power
Страница 44: ...Page 44 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Status Menu ...
Страница 46: ...Page 46 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Configuration Menu part 1 ...
Страница 47: ...Page 47 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Configuration Menu part 2 ...
Страница 51: ...Page 51 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 ...