Page 28
© 2021 ABB. All rights reserved.
CP:S6000_External Distribution_IG
Rev. 1.3
Rectifier Installation
All rectifier ac and dc connections are made when rectifiers are installed in the shelf and will power up
if ac is applied to the shelf.
Figure 11: Rectifier Installation
Step
Action
1.
Before engaging the rectifier connector into the back of the rectifier slot, press the Latch release
button, the latch will spring open. See Figure 11.
2.
Firmly push the rectifier into the rectifier slot until the connector on the rear of the rectifier engages
with the connector at the back of the rectifier slot on the CPS shelf. The latch will pop most of the
way up when the rectifier is properly seated. Push the latch up into the latched position.
3.
Repeat until all rectifiers are installed.
Содержание CPS6000-Systems-48V DC Power
Страница 44: ...Page 44 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Status Menu ...
Страница 46: ...Page 46 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Configuration Menu part 1 ...
Страница 47: ...Page 47 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 Configuration Menu part 2 ...
Страница 51: ...Page 51 2021 ABB All rights reserved CP S6000_External Distribution_IG Rev 1 3 ...