Connecting the control cables
Control cable connectors are located in the plinth. See the circuit diagrams delivered with
the converter.
Control connections in the plinth
Description
Connector
Customer connection for Ethernet
X3.1
Master-slave Ethernet connection
X3.2
Customer connection to fieldbus
X7
Customer connection for I/O
X9
Customer connection for auxiliary power output / Diesel generator input
X4
Service outlet
X115
Supply for light
X114
Supply for service / options 1
X202
Supply for service / options 2
X117
690 V supply for A3 (nacelle main control panel)
X201
Main supply and control voltage nacelle (A3 cabinet)
X107
Fiber optic from A3
A100, A101, K611
Converter cooling fan supply 1
X101
Converter cooling fan supply 2
X106
Supply tower fan (placed yaw)
X102
Single mode fiber interface - customer
A101
Emergency stop switch
S103
LED UPS feedback signal
X120
Converter coolant pump
X103
66 Electrical installation
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...