1. Undo the fastening screw (Torx T10) of the clip covering the memory card and press
the card to remove it. For the card location, see the following figure.
2. Insert the new card in reverse order. Tightening torque for fastening screw is 0.7 N·m
(0.5 lbf·ft). Repeat the replacement procedure for other BCU control unit if needed.
■
Replacement illustration
A
2:1
A
a
a
b
c
Main circuit breaker
For ABB-SACE main circuit breaker maintenance, refer to the manufacturer’s instructions
(1SDH001000R0002).
Maintenance 89
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...