Installation checklist
Contents of this chapter
This chapter contains instructions for checking the installation of the wind turbine converter.
Before you start
Check the mechanical and electrical installation of the converter before start-up. Go through
the checklist together with another person.
WARNING!
Only qualified electricians are allowed to carry out the work described below. Do
the tasks described in the safety instructions of the converter. If you ignore them,
injury or death, or damage to the equipment can occur.
1. Open the main disconnector of the converter and lock it to open position.
2. Ensure by measuring that the converter is not powered.
7
Installation checklist 69
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...