16. Insert M8 bolt to the hole on the top part of the module and turn it clockwise. This will
help in pushing the module out. It also helps in pulling simultaneously from the handle
while turning the screw.
16
17. Pull the module out a bit (5 cm [2 in]) and install the lifting hook to the lifting hole.
17
18. Pull the whole module onto the installation stand. Keep the pipes and wires away from
the sharp edges and be careful not to damage the coolant connections.
19. Lift the module onto a pallet or other platform for transportation.
20. Install a new module in reverse order. Tightening torque for cooling connectors is 10 N·m
(7.4 lbf·ft) in room temperature (20 °C [68 °F]).
Maintenance 87
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...