Fastening the cabinet to the floor
Bolt the converter to the floor through the holes in each flat bar at the base of the cabinet
using M12 screws.
We do not recommend welding (see section
).
Internal cooling circuit
For installations related to cooling, see chapter
Lifting the door
1. Unlock the door with the triangle key delivered with the cabinet. Open the handles.
2. Detach the upper part of the door.
3. Lift the door upwards.
1
2
3
46 Mechanical installation
4
Содержание ACS880-87LC-3200A
Страница 1: ... ABB WIND TURBINE CONVERTERS ACS880 87LC 3200A 3200A 7 wind turbine converters Hardware manual ...
Страница 2: ......
Страница 4: ......
Страница 10: ...10 ...
Страница 18: ...5 1 3 4 6 8 7 2 18 Safety instructions ...
Страница 48: ...48 ...
Страница 68: ...68 ...
Страница 75: ...b 3 a 2 6 c 4 Air flow direction is towards the converter module Maintenance 75 ...
Страница 85: ...14 Open the installation stand optional and place it in front of the module 14 Maintenance 85 ...
Страница 108: ...108 ...
Страница 112: ...Description CAN bus connection XCAN XCAN 112 BCU x5 control unit ...
Страница 116: ...116 Dimension drawings ...
Страница 117: ...Dimension drawings 117 ...
Страница 118: ...118 Dimension drawings ...
Страница 130: ...130 ...