68 Start-up with medium voltage stator
0
1
2
4
3 RUN
5
6
7 RESET
8
9
M
C
W
7.
01
0 RDYON
1 RDYRUN
(ready)
2 RDYREF
(operational)
4
3 TRIPPED
5
6
7 ALARM
8
9
MSW 8.10
11 MCB3 STATUS
12
13
15
14 TOGGLE BIT
DC voltage (ISU-INU)
Start command X2: 1-2
Heating ON
Auxiliary power ON
Fieldbus comm. starts
ISU contactor
ISU modulation
INU modulation
Grid connected
Grid connection
Cabinet temperature and humidity OK
Booting time
Discharged
Synchr. to grid
Stop sequence
Time
2
7
8
9
10
11
12
13
14
15
3
4
5
6
1
ABB Drives profile
Содержание ACS800-67
Страница 1: ...ABB wind turbine converters System description and start up guide ACS800 67 wind turbine converters ...
Страница 4: ......
Страница 76: ...76 Start up with medium voltage stator ...
Страница 99: ...Practical examples 99 1 4 4 3 2 5 6 7 ...
Страница 106: ...106 Practical examples Counterclockwise rotation at drive end D end Power cabinet Encoder ...
Страница 118: ...118 Tracing the source of warnings limits and faults ...
Страница 120: ...Contact us www abb com windconverters 3AUA0000095094 Rev B EN 2017 12 31 ...