Mechanical installation
62
Fastening the unit to the floor and wall (marine units, C121)
1. Bolt the cabinet to the floor through the holes in each flat bar at the base of the
cabinet using M10 or M12 screws.
Note
: Welding is not recommended, see
2. If there is not enough room behind the cabinet for installation, clamp the rear
ends of the flat bars.
3. Remove the lifting bars and fasten the top of the cabinet to the rear wall and/or
roof using brackets.
1
2
3
Cabinet roof
M16 bolt
L-bracket
Back panel of cabinet
Flat bars at base of cabinet
Clamps (not
included in
delivery)
Содержание ACS800-17LC
Страница 1: ...ABB industrial drives Hardware manual ACS800 17LC Drives 55 to 5200 kW ...
Страница 4: ......
Страница 10: ...Update notice 6 ...
Страница 18: ...Table of contents 12 ...
Страница 26: ...Safety instructions 20 ...
Страница 32: ...Introduction to the manual 26 ...
Страница 60: ...Hardware description 54 ...
Страница 74: ...Mechanical installation 68 ...
Страница 114: ...Electrical installation 108 ...
Страница 142: ...Maintenance 136 ...
Страница 150: ...Internal cooling circuit 144 ...
Страница 179: ...Dimensions 173 Frame sizes R7i R7i and R8i R8i bottom entry exit ...
Страница 180: ...Dimensions 174 Frame sizes R7i R7i and R8i R8i marine units C121 ...
Страница 182: ...www abb com drives www abb com drivespartners Contact us 3AUA0000065339 Rev B EN 2016 06 07 ...