![background image](http://html1.mh-extra.com/html/abb/acs355-series/acs355-series_quick-start-up-manual_3322119023.webp)
23
Configuring ACS580 drives
Starting ACS580 drives for PROFIBUS DP
1. Power up the drive.
2. Enable the communication between the adapter module and the drive by setting parameter
50.01
FBA A Enable
to Enable.
3. With parameter
50.02 FBA A comm loss func
, select how the drive reacts to a fieldbus
communication break.
Note:
This function monitors both communication between the fieldbus master and the adapter
module and communication between the adapter module and the drive.
4. With parameter
50.03 FBA A comm loss t out
, define the time between communication break
detection and the selected action.
5. Select application-specific values for the rest of the parameters in group 50, starting from 50.04.
6. Set the FPBA-01 configuration parameters in group 51. At the minimum, set the required node
address in parameter
51.02 Node address
and the communication profile in
51.05 Profile
= 1 (ABB
drives).
7. Define the process data transferred to and from the drive in FBA-01 configuration parameter groups
52 and 53.
Note:
The adapter module sets the Status word and Control word automatically in parameters
52.01
and
53.01
.
8. Validate the settings made in parameter groups 51, 52 and 53 by setting parameter
51.27 FBA par
refresh
to Configure.
9. Save the valid parameter values to permanent memory by setting parameter
96.07 Parameter save
manually
to Save.
10. Set the relevant drive control parameters to control the drive according to the application.
Содержание ACS355 series
Страница 1: ...Quick start up guide ABB Drives function blocks for Siemens PLC s...
Страница 76: ...A new subnet and IP protocol is added Figure 56 IP added...
Страница 84: ...9 Click to download the configuration to PLC Figure 73 Download to device...
Страница 139: ...139 Contact us www abb com drives www abb com drivespartners 3AXD50000037864 Rev B EN 2018 02 07...