
34 Planning the cabinet installation
Arranging the grounding inside the cabinet
Arrange the grounding of the drive module by leaving the contact surfaces of the fastening
points unpainted (bare metal-to-metal contact). The module frame will be grounded to the
PE busbar of the cabinet via the fastening surfaces, screws and the cabinet frame.
Alternatively, use a separate grounding conductor between the PE terminal of the drive
module and the PE busbar of the cabinet.
Ground also the other components in the cabinet according to the principle above.
Selecting the busbar material and preparation of the
joints
If planning the use of busbars, note the following:
•
Tin-plated copper is recommended but aluminium can also be used.
•
The oxide layer from aluminium busbar joints must be removed and suitable anti-
oxidant joint compound applied.
Tightening torques
Apply the following torques to grade 8.8 screws (with or without joint compound) that
tighten electric contacts.
Planning the fastening of the cabinet
Note the following when planning the fastening of the cabinet:
•
Fasten the cabinet to the floor from the front and to the floor or wall from the back.
•
Always fasten the drive module from its fastening points to the cabinet. For details, see
the module installation instructions.
WARNING!
Do not fasten the cabinet by electric welding. ABB does not assume
any liability for damages caused by electric welding as the welding circuit may
damage electronic circuits in the cabinet.
Screw size
Torque
M5
3.5 N·m (2.6 lbf·ft)
M6
9 N·m (6.6 lbf·ft)
M8
20 N·m (14.8 lbf·ft)
M10
40 N·m (29.5 lbf·ft)
M12
70 N·m (52 lbf·ft)
M16
180 N·m (133 lbf·ft)
Содержание ACQ810-04
Страница 1: ...ABB industry specific drives Hardware manual ACQ810 04 drive modules 200 to 500 kW 300 to 700 hp ...
Страница 4: ......
Страница 10: ...10 ...
Страница 22: ...22 Introduction to the manual ...
Страница 42: ...42 Planning the cabinet installation ...
Страница 75: ...Installation 75 Assembly drawing frame G1 ...
Страница 76: ...76 Installation Assembly drawing frame G2 ...
Страница 83: ...Installation 83 3 6a 6b 5 4 8 4 8 6a 6b 7a 7b 7b ...
Страница 84: ...84 Installation Assembly drawing of installing the drive module to the cabinet frame G1 ...
Страница 85: ...Installation 85 Assembly drawing of installing the drive module to the cabinet frame G2 ...
Страница 89: ...Installation 89 3AUA0000038989 TXD transmitter RXD receiver JRIB V2 V1 V7 V6 1 2 APOW 2 JINT 3 JRIB 1 4 4 JGDR ...
Страница 100: ...100 Installation ...
Страница 104: ...104 Installation checklist ...
Страница 106: ...106 Start up ...
Страница 108: ...108 Fault tracing ...
Страница 128: ...128 Technical data ...
Страница 130: ...130 Dimension drawings Frame G1 Drive module dimensions ...
Страница 131: ...Dimension drawings 131 Frame G1 Drive module dimensions with optional cabling panels H381 ...
Страница 132: ...132 Dimension drawings ...
Страница 133: ...Dimension drawings 133 Frame G1 Cabling panels H381 installed into a Rittal TS 8 cabinet ...
Страница 134: ...134 Dimension drawings Frame G2 Drive module dimensions ...
Страница 135: ...Dimension drawings 135 Frame G2 Drive module dimensions with optional cabling panels H381 ...
Страница 136: ...136 Dimension drawings ...
Страница 137: ...Dimension drawings 137 Frame G2 Cabling panels H381 installed into a Rittal TS 8 cabinet ...
Страница 138: ...138 Dimension drawings Bottom plate ...
Страница 142: ...142 du dt filters ...
Страница 144: ...3AUA0000120538 Rev A EN 2012 06 27 Contact us www abb com drives www abb com drivespartners ...