INSTALLATION
Cam Lock Test Procedure
1. Raise the hoist 1 metre from the ground.
2. Starting at the front of the hoist, position a raised floor jack under the
centre of the transverse beam.
3. With the raised floor jack in position, lower the hoist onto the floor jack
until the wire cables have gone slack. This will allow the Cam Locks to
operate.
4. With the wire cables now slack, quickly lower the floor jack so that the
Cam Locks engage the safety ladders. The Cam Locks must prevent
the hoist from lowering once the floor jack is lowered.
5. Repeat this above steps for the rear of the hoist also.
Electrical Connection
***PLEASE NOTE***
All electrical work on the hoist including motor connection & mains
supply connection must Only be performed by a qualified electrician
Important Information
It is the installers’ responsibility to ensure that all Fasteners, Nuts, Bolts
& Hydraulic Lines are checked and tightened.
It is the installers’ responsibility to train the operator(s) of this hoist and
to return the Vehicle Hoist Installation & Training Report to activate
warranty.
VOLTAGE
AMPS
240 Volt
1
5
AMP
415 Volt
20
AMP
16
Содержание AutoLift AL-6000A
Страница 10: ...Dimensions AL 6000S2 9 ...
Страница 18: ...Parts List 17 ...
Страница 19: ...18 ...
Страница 25: ...Air Line Diagram 24 ...
Страница 26: ...Electric motor jumper pins 25 ...
Страница 27: ...26 ...
Страница 28: ...How to operate Jack 27 ...