4 Post Hoist
OPERATING INSTRUCTIONS
The hoist should only be operated by personnel that have been
thoroughly trained in operation and maintenance of the hoist.
1. Position the vehicle between the columns, turn off the
engine and apply the park brake.
2. Place the manual wheel chocks in front and rear of at least
one wheel.
3. Make sure that all personnel are clear and there are no
obstructions around the hoist.
TO RAISE THE HOIST
1. Press the “UP” button on the control box until the desired
working height is obtained checking for any obstructions.
2. Once the hoist has reached the desired working height lower
the hoist onto the safety locks by means of pressing the park
button on the control box.
Note: Check for correct engagement of each lock.
TO LOWER THE HOIST
1. Raise the hoist 100mm or until the locks are clear.
2. Push on the “DOWN” button
Note: The hoist will automatically raise approximately 50mm.
3. Check for any obstructions under the hoist when lowering and
all personnel are clear of the area.
4. When the hoist has been lowered to the ground, remove the
wheel chocks.
5. Switch off power to the hoist.
MODEL:
AutoLift AL-
6
000S2
SERIAL NO.:
APPROVALS:
WAH2
2165
Design Code: AS1418.9 -1996
31
6 TONNE
Содержание AutoLift AL-6000A
Страница 10: ...Dimensions AL 6000S2 9 ...
Страница 18: ...Parts List 17 ...
Страница 19: ...18 ...
Страница 25: ...Air Line Diagram 24 ...
Страница 26: ...Electric motor jumper pins 25 ...
Страница 27: ...26 ...
Страница 28: ...How to operate Jack 27 ...