ZXR10 T8000 Hardware Installation Guide (Cluster)
The data plane cascade connections of the ZXR10 T8000 cluster 1+4 system are as shown
in
Figure 2-1
. The interfaces on an LCC are connected to the interfaces of the same color
and number on the CFC.
Figure 2-1 ZXR10 T8000 Data Plane Cascade Connections of Cluster 1+4
Installing Cascade Fibers
Before installing cascade fibers, reserve a cabling path and space, and prepare sufficient
cascade fibers.
To install cluster dedicated fibers, follow these steps:
2-2
SJ-20110901170352-005|2011-10-15 (R2.0)
ZTE Proprietary and Confidential