ZXG10 iBSC Hardware Installation Guide
5.2.5 Installing Base
Steps
1.
Installing the expansion bolts
i.
Use a cleaner to suck dust inside and outside the holes. Measure the spacing
between holes and place the adjustable base to check whether the base matches
the holes. For holes with a large deviation, it is necessary to reposition and re-drill
the holes before installing the expansion bolts, as shown in
Figure 5-11 Installing Expansion Bolt 1
ii.
Take off the washer and the nut of the expansion bolt and place the expansion rod
and expansion bush vertically into the hole, as shown in
Figure 5-12 Installing Expansion Bolt 2
iii. Use a rubber hammer to strike the expansion bolt until the expansion bush is fully
inserted into the ground, as shown in
.
5-10
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...