ZXG10 iBSC Hardware Installation Guide
Figure 11-5 Step 1 of Board Unplugging
2.
After ENUM indicator on board panel flashes in the frequency of 1Hz, rotate the
extractor outwards by both hands, enable the extractor completely out of horizontal
beam slots in subrack, then slowly pull out the board. Refer to
Figure 11-6 Step 2 of Board Unplugging
3.
Slowly pull out the board along upper and lower slides in the standard 97 subrack, and
then carefully remove the board from the slide. Refer to
.
11-4
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...