Chapter 3
Installation Preparations
This chapter introduces the preparations prior to ZXG10 iBSC installation, including
preparation of auxiliary equipment, construction team, instruments, and technical
documents.
Table of Contents
3.1 Staff Preparation
Appoint proper construction team to install ZXG10 iBSC and coordinate its schedule. Only
trained and qualified staff from ZTE can do equipment installation and commissioning.
3.2 Auxiliary Equipment Preparation
It refers to the required equipment prior to installation, such as power supply, grounding
busbar, cabling trough, and distribution frame. Before installing the ZXG10 iBSC, verify
that the readiness and applicability of related auxiliary equipment, to avoid the potential
delay when the system is undergoing trial test after the installation. In general, the user
shall do the following inspection.
3.3 Instruments and Meters Preparation
For the installation and test of ZXG10 iBSC and its maintenance background console in
different stages, different instruments are required.
Please prepare them according to the requirements listed in
. Avoid possible
onsite delay.
Table 3-1 Instruments and Meters Required at Different Stages
Stage
Instruments and Tools
Function
Unpacking and inspecting
goods
Pliers, crowbar, hammer,
paper cutter.
To open the case.
3-1