ZXG10 iBSC Hardware Installation Guide
Figure 7-5 Installation Flow of Indoor Forwarding Scheme
7.3 Installation Preparations
1.
Installation Personnel
The antenna feeder system should be installed by the installation personnel under the
supervision of an Installation Supervisor.
Before installing the GPS antenna feeder system, check the qualifications of the
installation personnel who are to work at heights, prepare and check the installation
environment, safety measures, installation tools and system components to ensure a
successful installation.
The installation supervisor shall be familiar with the materials, tools and operation
methods, and is responsible for organizing and coordinating installation personnel
as well as assigning suitable jobs to suitable persons in the principle of "safety first",
especially the jobs on towers.
The installation supervisor is also responsible for
truthfully recording engineering data.
7-6
SJ-20110531095035-004|2011-10-28 (R2.0)
ZTE Proprietary and Confidential
Summary of Contents for ZXG10 iBSC
Page 8: ...II ...
Page 167: ...Figures Figure 11 7 Step 3 of Board Unplugging 11 5 V ...