ZXA10 C300 Configuration Manual (CLI)
Figure 16-16 Configuration Flowchart of VPWS
Steps
l
Configuration on C300-1.
1.
Configure the loopback interface.
ZXAN(config)#interface loopback1
ZXAN(config-loopback1)#ip address 1.1.1.1 255.255.255.255
ZXAN(config-loopback1)#exit
2.
Configure the VLAN of the uplink interface.
ZXAN(config)#interface gei_1/21/1
ZXAN(config-if)#switchport vlan 10 tag
ZXAN(config-if)#exit
3.
Configure the IP address of the VLAN interface.
ZXAN(config)#interface vlan 10
ZXAN(config-if-vlan10)#ip address 10.1.1.1 255.255.255.0
4.
Enable the MPLS on the VLAN interface.
ZXAN(config-if-vlan10)#mpls ip
ZXAN(config-if-vlan10)#exit
16-50
SJ-20130520164529-007|2013-06-30 (R1.0)
ZTE Proprietary and Confidential