Contents
Chapter 2 Installation Preparations .......................................................... 2-1
Chapter 3 Unpacking and Checking Equipment ..................................... 3-1
Chapter 4 Removing Cabinet Doors ......................................................... 4-1
Chapter 6 Installation of External Power Cables and Grounding
Chapter 7 Assembly Installation in a Cabinet.......................................... 7-1
Chapter 8 Installation of Internal Power Cables and Grounding
Chapter 9 Signal Cable Installation .......................................................... 9-1
9.2 Setting Jumpers and DIP Switches of the Unified PDU ........................................ 9-4
Chapter 10 Cabinet Accessory Installation............................................ 10-1
Chapter 11 Peripheral Device Installation .............................................. 11-1
I
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential