NetNumen™ U31 R06 Hardware Installation Guide
Marking Holes for Installing Multiple Cabinets (Unit: mm) .................... 5-20
Marking Installation Holes Using the Drilling Template ......................... 5-21
Hammering a Socket Bolt .................................................................... 5-23
Adjusting the Level of the Cabinet........................................................ 5-25
Measuring Resistance of the Cabinet................................................... 5-26
Space Between Side-by-Side Cabinets................................................ 5-27
Connecting Neighboring Cabinets........................................................ 5-28
Installing the Shockproof Assembly (1) ................................................ 5-29
Installing the Shockproof Assembly (2) ................................................ 5-30
Power Supply System of a Cabinet .......................................................... 6-2
Routing of Power Cables and Grounding Cables ..................................... 6-3
Installation Modes of O-Type Terminals.................................................... 6-4
Distance Between Power Cables and Signal Cables................................ 6-5
Bottom Routing of a Cabinet .................................................................... 6-7
Jumpers of the NCDM Board ................................................................... 7-2
Relationships Between Active and Standby Slots..................................... 7-4
Wearing an ESD wrist strap ..................................................................... 7-4
Removing a Rear Blank Panel ................................................................. 7-5
Removing a Front blank panel ................................................................. 7-6
Checking the Memory Installation ............................................................ 7-7
Opening the Extractors for the Memory Slots ........................................... 7-8
Reinstalling the Memory Bar .................................................................... 7-9
Opening Extractors of a Board ............................................................. 7-10
Installing Grounding Cables for the E4140 Shelf ...................................... 8-4
Installing Power Cables for the E4140 Shelf............................................. 8-5
II
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential