Chapter 5 Cabinet Installation
Figure 5-37 Installing the Shockproof Assembly (1)
1.
Horizontal
support
2.
Vertical support
3.
Cable ladder
4.
M12×25/M8×25
hexagon socket
cap head
bolt (Spring
washer, gasket,
and insulating
washer)
5.
Insulating gasket
6.
Lock rod (M8
hexagon nut,
spring washer,
and gasket)
7.
Bolt (M8 nut,
spring washer,
and gasket)
l
For the shockproof assembly installation when the vertical connection plates are
not close to the cable ladder, see
.
5-29
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential