Chapter 2 Installation Preparations
Picture
Name
Purpose
Tape measure
Measures length.
Angle square
Measures length or draws right an-
gles.
Spirit level
Checks the level of adjustable
bases and cabinets.
Plumb line
Checks vertical deviation of a cabi-
net.
Marker pen
Marks the positions of drilled holes
on the floor.
Powder marker
Marks lines on the ground to de-
termine the position where a socket
bolt is installed.
Claw hammer
Installs socket bolts and opens
wooden cases.
Percussion drill
Drills holes.
Vacuum cleaner
Cleans installation holes and the
floor.
2-3
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential