NetNumen™ U31 R06 Hardware Installation Guide
Steps
1.
Verify that the terminal devices and the alarm box are installed in a proper position in
accordance with the design requirements.
2.
Verify that the alarm box is installed in a prominent place, and that the power cable
and signal cable are routed in Polyvinyl Chloride (
) trunking.
3.
Verify that there are sufficient
power sockets for the terminal devices, and that
these sockets are within the reach of the power cables of the terminal devices.
4.
Verify that no waste material, such as desiccant or scrap of cable ties or cables, is left
in the cable trunking, on the cable ladder, or around the cabinets.
5.
Verify that the articles in the equipment room are kept in order.
– End of Steps –