NetNumen™ U31 R06 Hardware Installation Guide
Steps
Positioning the cabinet
1.
Mark the installation holes for socket bolts by using measurement tools and line
drawing tools.
l
For the installation holes of socket bolts to install a single cabinet, see
Figure 5-25 Marking Holes for Installing a Single Cabinet (Unit: mm)
1.
Installation hole
2.
Wall
l
For the installation holes of socket bolts to install multiple cabinets, see
Figure 5-26 Marking Holes for Installing Multiple Cabinets (Unit: mm)
1.
Installation hole
2.
Wall
5-20
SJ-20141121113158-006|2014-12-20 (R1.0)
ZTE Proprietary and Confidential