V1.0

Warnings!

 

15kg

30kg

50kg

 When installing 4U or bigger servers, at least 4 people are needed.

 During the installation process, please do not block the vents on the server, especially the vents 

on the front and rear of the server.

 Please remove the protective film from the server surface before using.

 Please leave a minimum of 15cm clearance on the front and rear sides of the server for proper 

ventilation.

 Please install air baffles in place prior to device installation, to make sure that the server can get 

enough air flow, and to avoid air turbulence in the server room.

  Servers  are  high-power  electrical  appliances,  and  they  should  be  installed  into  dedicated 

cabinets with vents or professional water-cooled cabinets, to prevent system failures caused by 
overheating.

 If it needs to install more than one device, please load them from the bottom to the top, and load 

the heaviest items first.

 Please note the cabinet’s load-bearing capacity, power supply capacity and heat dissipation 

capacity, be sure not to install devices beyond the cabinet’s threshold capacity.

 For the convenience of using the front and rear ports of the server and cabling, leave a minimum 

clearance of 70mm between the front end of the server and the inner side of the cabinet’s front 
door, and 150mm between the rear end of the server and the inner side of the cabinet’s rear 
door.

Please keep this document for future reference.

If the device is more than 15kg, at least 2 people are needed.

If the device is more than 30kg, at least 3 people are needed.

If the device is more than 50kg, at least 4 people are needed.

The cabinet, chassis or guide rails may cause serious scratches, 
please be careful while handling.
When  installing  new  servers  into  the  cabinet  in  use,  please  be 
aware of electric shock.

PN

4U Server

Installation Guide