COMPUTER-CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE
- 5 -
4. Installing the drain receiver
Fix drain receiver in the installing
②
hole of table wit
①
h four setscrews .
③
Screw in drain bin
to drain
④
receiver . Insert sewing machine
②
drain pipe into drain bin .
⑤
④
Insert drain pipe until it will
⑤
go on further so that it does not
come off drain bin
when
④
tilting the machine head
1
4
2
5
5
2
3
5. Tilting the sewing machine head
turn head gently down , and leaning
①
the head on the head supporting bar at .
②
1. Before tilting the sewing machine
head, make sure that head support
rod
is attached to the machine
①
table
;
2. When raising the sewing machine
head, do not raise it while holding
motor cover .It will be the cause
②
of breakage of motor cover .
②
3. Be sure to tilt the sewing machine
head on a flat place to prevent it
from falling.
1
2
6. Installing the operation panel
Use four wood screws fix the operator
①
panel
on the table
②
in a comfortable
③
operation position, then the operator panel
②
corresponding wire hole through the table ,
③
and then dock with the other side.
Summary of Contents for ZJ1900DSS
Page 6: ...高速电子套结机 2 各部件名称 1 主机的名称 缝纫机机头 送布压脚 线架 操作面板 电源开关 脚踏开关 2 2 1 2 5 3 2 6 2 4 2 7 机架 ...
Page 9: ...高速电子套结机 5 7 电线的连接 脚踏板 操作面板 8 眼睛防护罩的安装 为防止断针飞起弄伤眼睛 请一定安装起来 将附件箱中眼睛防护罩装在机头 如图所示左侧 ...
Page 25: ...高速电子套结机 21 图1 ...
Page 67: ...高速电子套结机 Ⅵ 台板图纸 63 Ⅱ ...
Page 96: ...COMPUTER CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE 25 图1 ...
Page 97: ...6 ...
Page 146: ...COMPUTER CONTROLLED HIGH SPEED LOCKSTITCH BAR TACKING MACHINE 75 Ⅵ DRAWING OF THE TABLE Ⅱ ...