7
2.1.2 GenSalt OT cell
16,5 cm
22,5 cm
27,5 cm
7,5 cm
27,5 cm
12,5 cm
•
The cell must be installed on a horizontal pipe to ensure an essenti ally horizontal fl ow of water through it,
with no more than a 30 deg angle/slope. The pipe must have a free horizontal length of at least 30cm on
which the cell will be installed. The cell must also be installed as far away as possible from any bends or
elbows in the plumbing (
).
•
Ensure that the directi on of fl ow of water through the cell is in accordance with the arrows marked on the
cell (see arrows (
)).
INLET
OUTLET
30°
0°
30°
max.
max.
•
Dismantle the cell (
).
•
Positi on EU (DN50 mm) hole adapter upside down at the positi on where the pipe will be installed (
).
•
Use a drill bit or centre-punch to mark the positi ons of the holes to be drilled on the pipe, remove EU
(DN50 mm) hole adapter, and drill the holes using the hole saw supplied.
•
Check that the edges are perfectly smooth and deburred (use abrasive paper, for example).
•
Clip together the lower and upper parts of the cell collar on the pipe at the holes, respecti ng the water fl ow
directi on (use the “EU” Ø50 reducer for a Ø50 mm pipe).
•
Positi on the top transparent part of the cell (presence of a foolproof locati ng notch), positi on the locking
ring on the thread of the upper collar by aligning the point (
) of the collar with the arrow of the collar (
), then ti ghten fi rmly by hand (do not use a tool).
•
Connect the cell power supply cable in compliance with the wire colour codes (red, black and blue connec-
tors) and then fi t the protecti ve cap.
For GenSalt OT 10,
the second red connector will not be connected;
leave it as it use before positi oning the protecti ve cover.