Pelletherm V.4 LT
23
ensure correct and reliable operation of the boiler it is necessary to evenly level it, in order to
provide its proper air freeing.
5.4.1.
CONNECTING TO THE CHIMNEY.
After installation and evening of the boiler it must be connected to a chimney, by ensuring the
requirements for efficient and reliable operation of the system.
Figure 5.1. Rear side view of a hot water boiler from series “Pelletherm V.4 LT”.
5.4.2.
CONNECTING TO THE HEATING INSTALLATION.
As next connect the hot water pellet boiler from series “Pelletherm V.4 LT” to the heating
installation, by using proper fittings and accessories – to be performed in accordance to the
preliminary prepared technical project.
5.4.3.
INSTALLATION OF THE PELLET BURNER FROM SERIES “GP XX SC”.
During installation of the pellet burner from series “GP xx sc” it is necessary to
observe all presented requirements in its manual book. The mineral wool
sealing, designated for the burner’s mounting flange, must be also installed –
it serves for isolation and limitation of the heat flow coming from the boiler to
the burner.
Muff – circulations water inlet
Muff – circulations water outlet
Flue gas extraction tube
Summary of Contents for PELLETHERM V.4 LT SERIES
Page 46: ...Pelletherm V 4 LT 46...
Page 48: ...Pelletherm V 4 LT 48...