
*Weight of the front three-point hitch
Valve for filling tyre tubes with liquid
Procedure of filling the tyres with liquid
F226
1. Unload the tyre by lifting the tractor and turn it with the valve upwards (A).
2. Deflate the tyre and unscrew the valve insert.
3. Screw the adapter for water filling on and attach the liquid supply hose to it.
4. Fill the tyre with the prescribed quantity of liquid.
5. For the filling you can use a gravity tank (B) or you can fill the tyre under pressure (C).
6. Remove the hose and unscrew the adapter for water filling.
7. Screw on the valve insert and inflate the tyre to the prescribed pressure.
8. After inflating screw the protective cap on the valve.
9. Fill the other tyre in the same way.
Water must not freeze in a tyre!
Material
Weight mass
(kg)
Cast-iron
460
Concrete
800
E552a
All the tubes of the rear wheels are equipped with a valve
that makes it possible to fill the tubes with liquid with the
use of an adapter.
Filling the tubes of the front tyres and double
mounting of the rear wheels with liquid is not
permitted.
F_02_109
BALLAST WEIGHTS
160
Summary of Contents for FORTERRA HSX Series
Page 1: ...FORTERRA HSX 120 130 Tractor is Zetor Since 1946 140 120 130 140 OPERATOR S MANUAL 2 2018...
Page 3: ...2...
Page 51: ...NOTES 50...
Page 75: ...NOTES 74...
Page 115: ...NOTES 114...
Page 139: ...NOTES 138...
Page 153: ...NOTES 152...
Page 168: ...167...
Page 169: ...Fuse panel B FHSX18N001 ELECTRIC INSTALLATION 168...
Page 220: ...219...