
General principles of new tractor run-in in first 100 hours of operation
F11N030
During first 100 hours of operation:
z
Load tractor in a normal way, avoid operation with low or maximum engine revolutions
z
Avoid operation under partial loading of the engine
z
Avoid excessive idle run operation
z
Check oil levels in engine often (during this time increased oil consumption is normal)
z
Check screw joints in particular in supporting parts of tractor
z
Learned insufficiencies to be removed immediately, you will thus prevent subsequent damage or
endangered operation
z
Keep the same procedure also after tractor complete overhaul
In first 10 hours of operation
From 100 hours of operation
z
perform run-in in traffic
z
tighten fastening nuts of front and rear wheels including
connectionbead / rim with prescribed torque
F11N031
After drive in completion you can work with tractor without
limitations.
Recommended
operation
revolutions
1,400 - 2,300
rpm
Idle run revolutions 800 ± 25 rpm
Operation oil
pressure
0.2 - 0.5 MPa
Oil pressure with
idle run revolutions
min. 0.05 MPa
Max. coolant
temperature
110°C
E256
RUNNING IN THE TRACTOR
113
Summary of Contents for FORTERRA HSX Series
Page 1: ...FORTERRA HSX 120 130 Tractor is Zetor Since 1946 140 120 130 140 OPERATOR S MANUAL 2 2018...
Page 3: ...2...
Page 51: ...NOTES 50...
Page 75: ...NOTES 74...
Page 115: ...NOTES 114...
Page 139: ...NOTES 138...
Page 153: ...NOTES 152...
Page 168: ...167...
Page 169: ...Fuse panel B FHSX18N001 ELECTRIC INSTALLATION 168...
Page 220: ...219...