OPERATING WEIGHTS – COPPER FIN COILS
ISOLATOR
MAX LOAD
DEFL.
TYPE & SIZE
lbs.
kg
in.
mm
AWMR-1-53
1000
453.6
2
51
AWMR-1-530
1150
521.6
2
51
AWMR-1-531
1276
578.8
2
51
AWMR-1-532
1500
680.4
2
51
AWMR-1-551
1676
760.2
2
51
AWMR-1-552
1900
861.8
2
51
AWMR-1-553
2200
997.9
2
51
AWMR-2-531
2552
1157.6
2
51
AWMR-2-532
3000
1360.8
2
51
COPPER FIN COIL WEIGHT DISTRIBUTION BY MODEL ( KGS )
YCAS
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
TOTAL
0373
764
691
861
––
607
745
899
––
4,567
0403
777
700
880
––
627
757
928
––
4,668
0453
782
708
883
––
614
754
908
––
4,649
0503
794
717
901
––
633
767
937
––
4,750
0543
796
633
784
589
877
615
754
697
5,745
0573
803
640
794
591
867
612
748
689
5,744
0623
814
646
803
599
884
621
762
702
5,831
0653
901
732
1060
499
960
681
1147
514
6,494
Technical Data
INSTALLATION INSTRUCTIONS FOR VMC SERIES AWR/AWMR
AND CP RESTRAINED MOUNTINGS
1. Floor should be level and smooth.
2. For indoor applications, isolators do not normally
require bolting. If necessary, anchor isolators to floor
through bolt holes in base plate. IMPORTANT:
Isolators must be bolted to substructure and
equipment to isolators when used under out-
door equipment exposed to wind forces.
3. Lubricate threads of adjusting bolt. Loosen hold-
down bolts to allow for isolator adjustment.
4. Block the equipment 1/4" higher than the specified
free height of the isolator. To use the isolator as
blocking for the equipment, insert a 1/4" shim be-
tween the upper load plate and vertical uprights.
Lower the equipment on the blocking or shimmed
isolators.
5. Complete piping and fill equipment with water, re-
frigerant, etc.
6. Turn leveling bolt of first isolator four full revolu-
tions and proceed to mount each in turn.
7. Continue turning leveling bolts until equipment is fully
supported by all mountings and equipment is raised
free of the spacer blocks or shims. Remove blocks
or shims.
8. Turn leveling bolt of all mountings in either direction
in order to level the installation.
9. Tighten nuts on hold down bolts to permit a clear-
ance of 1/8" between resilient washer and under-
side of channel cap plate.
10. Installation is now complete.
ISOLATOR
MAX LOAD
DEFL.
SPRING
TYPE & SIZE
lbs.
kg
in.
mm
COLOR
CP-2-26
1200
544.3
1.17
29.7
Purple
CP-2-27
1500
680.4
1.06
26.9
Orange
CP-2-28
1800
816.4
1.02
25.9
Green
CP-2-31
2200
997.9
0.83
21.0
Gray
CP-2-32
2600
1179.3
0.74
18.7
White
CP-2-35
3000
1360.8
0.70
17.7
Gold
Summary of Contents for MILLENNIUM YCAS
Page 53: ...53 YORK INTERNATIONAL FORM 201 18 NM2 WIRING DIAGRAM ACROSS THE LINE START 7...
Page 54: ...54 YORK INTERNATIONAL FIG 12 CONTINUED ELEMENTARY DIAGRAM Technical Data...
Page 59: ...59 YORK INTERNATIONAL FORM 201 18 NM2 WIRING DIAGRAM WYE DELTA START LD03229 FIG 15 CONT D 7...
Page 60: ...60 YORK INTERNATIONAL FIG 15 CONTINUED ELEMENTARY DIAGRAM Technical Data...
Page 62: ...62 YORK INTERNATIONAL FIG 16 POWER PANEL FRONT INSIDE VIEW WYE DELTA START Technical Data...
Page 68: ...68 YORK INTERNATIONAL FIG 24 DETAIL B Technical Data...