IM 01F06A00-01E
REVISION RECORD
Edition
6th
Date
Jan. 2005
Page
5-6
5-8
5-16
9-5
9-8
9-13
9-18/25
10-7
10-8
10-9
Revised Item
Correction.
Added a parameter.
Added a parameter explanation and corrections.
Revision (MS code).
Revision (Option Specification).
Revision.
Revision.
Revision.
Revision.
Revision.
7th
July 2005
2-5
7-8
9-3
9-6
10-1/13
Added a “CAUTION” about heat insulating material installation.
Revised the formura 7.14.3.
Changed the EMC Conformity Standards No..
Deleted DIN64 and DIN100 (Suffix Code: BD5 and BD6).
Added Applicable Standard No.and Certificate No. to each Approval body.
8th
Nov. 2005
2-7
3-5
4-21-25
4-24
5-15
5-16
8-2
9-5
9-6
9-7
9-8
9-10
9-11
9-12
9-14
9-19
9-20
9-22
9-23
9-24
Revision: Vertical Installation.
Revision: 7.
Revision.
Revision <K36>.
H27: Revision.
J10, J20: Revision.
Revision.
Revision of specification.
Revision of specification.
Revision of specification.
Revision of specification.
Table 9.4.3: Revision.
Revision of specification.
Revision of specification.
Table 9.5.1: Revision.
Tables: Revision.
Tables: Revision.
Tables: Revision.
Tables: Revision.
Revision.
9th
May. 2006
2-2
2-3
3-4
4-9
5-1
5-5
5-13
5-14
7-2
7-3
7-5
Chap.9
Revision.
Add a note to "Valve position (T-type pipe exist)" and "Heat - Insulation".
Revision: Figure 3.6.
Revision: Figure 4.5.
Add a "IMPORTANT" to 5.2.
Add Data Range to <E20>.
Add descriptions to <E20>.
Add a "IMPORTANT" to <F52>.
Revision figures.
Revision figures.
Revision figures.
Revision, Added optional items, etc.