![YOKOGAWA DpharpEJX vigilantplant EJX910A User Manual Download Page 4](http://html1.mh-extra.com/html/yokogawa/dpharpejx-vigilantplant-ejx910a/dpharpejx-vigilantplant-ejx910a_user-manual_3750163004.webp)
iii
CONTENTS
IM 01C25R01-01E
Calibration Instruments Selection ....................................................... 9-1
Pressure and Static Pressure. ..................................................... 9-1
External Temperature (RTD) ........................................................ 9-2
Disassembly and Reassembly ............................................................ 9-4
Replacing the Integral Indicator ................................................... 9-4
Replacing the CPU Board Assembly ........................................... 9-5
Cleaning and Replacing the Capsule Assembly .......................... 9-5
Replacing the Process Connector Gaskets ................................. 9-7
Basic Troubleshooting .................................................................. 9-7
Troubleshooting Flowcharts ......................................................... 9-8
Alarms and Countermeasures ................................................... 9-10
10. GENERAL SPECIFICATIONS .................................................................... 10-1
10.1 Standard Specifications .................................................................... 10-1
10.2 MODEL AND SUFFIX CODES ......................................................... 10-5
10.3 OPTIONAL SPECIFICATIONS .......................................................... 10-7
10.4 DIMENSIONS .................................................................................... 10-9