4. TRANSPORT OF THE MACHINE
79
4.1. The transport should be done by qualified personnel only.
4.2.
The machine should be transported by lifting with proper equipment ( not touching the ground
during the transport ).
4.3.
Unless customer requests the contrary, the machine will be delivered with wooden packaging.
4.4.
Movable parts on the machine should be fixed before carrying out the transport.
4.5.
The machine size and weight measurements, given the technical specification sheet.
4.6.
In order to get more stability when hanging the machine in case of move it, hang it from bottom
insofar. Move the machine without shaking it in slow movements. Be sure to take care of persons
in dangerous places.
Summary of Contents for DC 550
Page 1: ...www yilmazmachine com tr ...
Page 61: ...7 OPERASYON 60 ...
Page 118: ...7 OPERATION 117 ...
Page 175: ...7 ОПЕРАЦИЯ 174 ...