
YASKAWA
TOEPC71061737D GA800 DRIVE INSTALLATION & PRIMARY OPERATION
63
1.
Remove the nuts on terminals R/L1, S/L2, and T/L3, and remove the common bus bars.
A - Common bus bar
B - Nut
Figure 7.29 Remove Common Bus Bars
2.
Wire the closed-loop crimp terminal to the main circuit terminal block.
Figure 7.30 Install the Electrical Wires
3.
Tighten the nuts to the specified torque.
Figure 7.31 Tighten the Terminal Block Nut