
118
YASKAWA
TOEPC71061737D GA800 DRIVE INSTALLATION & PRIMARY OPERATION
Model
Terminal
Recomm. Gauge
mm
2
Applicable Gauge
(IP20 Applicable Gauge
)
mm
2
Wire Stripping
Length
mm
Terminal Screw
Size and Shape
Tightening Torque
N
∙
m (lbf
∙
in)
4023
R/L1, S/L2, T/L3
6
2.5 - 10
(2.5 - 10)
10
M4
1.5 - 1.7
(13.5 - 15)
U/T1, V/T2, W/T3
4
2.5 - 10
(2.5 - 10)
10
M4
1.5 - 1.7
(13.5 - 15)
-, +1, +2
6
2.5 - 16
(2.5 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
B1, B2
2.5
2.5 - 4
(2.5 - 4)
10
M4
1.5 - 1.7
(13.5 - 15)
6
4 - 10
(-)
-
M5
2.0 - 2.5
(17.7 - 22.1)
4031
R/L1, S/L2, T/L3
10
2.5 - 25
(10 - 25)
18
M5
2.3 - 2.5
(19.8 - 22)
U/T1, V/T2, W/T3
6
2.5 - 16
(6 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
-, +1, +2
10
2.5 - 35
(10 - 35)
20
M6
5 - 5.5
(45 - 49)
B1, B2
2.5
2.5 - 10
(2.5 - 10)
10
M4
1.5 - 1.7
(13.5 - 15)
10
6 - 16
(-)
-
M6
5.4 - 6.0
(47.8 - 53.1)
4038
R/L1, S/L2, T/L3
10
2.5 - 25
(10 - 25)
18
M5
2.3 - 2.5
(19.8 - 22)
U/T1, V/T2, W/T3
6
2.5 - 16
(6 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
-, +1, +2
16
2.5 - 35
(10 - 35)
20
M6
5 - 5.5
(45 - 49)
B1, B2
4
2.5 - 10
(2.5 - 10)
10
M4
1.5 - 1.7
(13.5 - 15)
10
6 - 16
(-)
-
M6
5.4 - 6.0
(47.8 - 53.1)
4044
R/L1, S/L2, T/L3
16
2.5 - 16
(4 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
U/T1, V/T2, W/T3
10
2.5 - 10
(6 - 10)
18
M5
2.3 - 2.5
(19.8 - 22)
-, +1, +2
25
2.5 - 25
(6 - 25)
18
M5
2.3 - 2.5
(19.8 - 22)
B1, B2
6
2.5 - 6
(2.5 - 6)
10
M4
1.5 - 1.7
(13.5 - 15)
16
10 - 25
(-)
-
M6
5.4 - 6.0
(47.8 - 53.1)
4060
R/L1, S/L2, T/L3
16
2.5 - 16
(4 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
U/T1, V/T2, W/T3
16
2.5 - 16
(6 - 16)
18
M5
2.3 - 2.5
(19.8 - 22)
-, +1
25
2.5 - 25
(6 - 25)
18
M5
2.3 - 2.5
(19.8 - 22)
B1, B2
10
2.5 - 10
(2.5 - 10)
10
M4
1.5 - 1.7
(13.5 - 15)
16
10 - 25
(-)
-
M6
5.4 - 6.0
(47.8 - 53.1)